BACK
Fictions as Practice
transfert << / >>
growing




- " 1m² = 1m3 ", Berlin, 1992
-
- Berlin, 1992, Germany
- Architect:
NewT-R&Sie(n)...
- (name of the agency at this time : Roche, François, Lewis,
Hubert, Roubeau, Perrin, with in shadow Stephanie Lavaux)
- Key dimensions: 100 000 m²
- Text :
- Competition for the construction of the Bundestag in Berlin
- Scenario :
- 1) Movement of the ground including the basement of the Reichstag
for a new equilibrium : 1m² of construction against 1m3 of soil.
- 2) Introduction of the huge program in a geological fold.
- 3) Using the river, the Spree like an open sky corridor, by
riverboat.
BACK